image/svg+xml The SwitchMed programme is funded by the European Union image/svg+xml image/svg+xml

This practice illustrates a complete upgrade for steam and electricity generation systems within a company, based on energy efficient design concepts. Through this upgrade, smaller electricity generators are to replace the existing ones. In turn their waste heat can be utilized in generating a portion of steam demand, which allows to replace the old low efficient boiler with smaller ones.