image/svg+xml The SwitchMed programme is funded by the European Union image/svg+xml image/svg+xml

A company producing soft drinks with different flavors has to clean the production line whenever there is a change in product. Production plan imposed 3-4 changeovers per day, which was the cause of high consumption of water and chemicals associated with each CIP cycle.
Changing the production plan to reduce the frequency of product change, saving on chemical use, energy and water consumption.